Campo Largo Wind Complex - ENGIE Brasil

The Campo Largo I Wind Complex, in the northern state of Bahia, municipality of Sento Sé, is the first stage of the Campo Largo project. This initial phase corresponds to 326.7 MW in installed capacity from 121 2.7 MW wind turbines distributed across 11 wind farms. For a better sense of its dimensions, the wind turbines’ fans are 122 meters across; the towers are 89 meters tall; and each fan blade is 59.3 meters long. Construction began in 2016 and was completed with the entry into operation of the final farm in December 2018. The wind farms’ operating license is valid to 2052.

In 2018, remote operation of the Campo Largo I Wind Complex began at the Generation Operations Center (COG), located in ENGIE’s registered offices in Florianópolis (state of Santa Catarina).

Plants of the complex

Campo Largo Wind Complex I

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex II

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex III

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex IV

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex V

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex VI

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex VII

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex XV

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex XVI

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex XVIII

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Campo Largo Wind Complex XXI

Last updated: 00:00

*ENGIE installed capacity:
-- MW

-- MW

of -- MW*

Net Generation

Showing

Month monthly production Campo Largo Wind Complex I (GWh) total annual
Month monthly production Campo Largo Wind Complex II (GWh) total annual
Month monthly production Campo Largo Wind Complex III (GWh) total annual
Month monthly production Campo Largo Wind Complex IV (GWh) total annual
Month monthly production Campo Largo Wind Complex V (GWh) total annual
Month monthly production Campo Largo Wind Complex VI (GWh) total annual
Month monthly production Campo Largo Wind Complex VII (GWh) total annual
Month monthly production Campo Largo Wind Complex XV (GWh) total annual
Month monthly production Campo Largo Wind Complex XVI (GWh) total annual
Month monthly production Campo Largo Wind Complex XVIII (GWh) total annual
Month monthly production Campo Largo Wind Complex XXI (GWh) total annual

Location

Lagoa do Angico, s/nº
Zona rural
CEP 47350-000
Sento Sé / BA

(75) 3023-4535

View list of the program’s plants

Find out more