{"id":115429,"date":"2024-08-07T22:13:23","date_gmt":"2024-08-07T22:13:23","guid":{"rendered":"https:\/\/www.engie.com.br\/?post_type=imprensa&#038;p=115429"},"modified":"2024-08-07T22:14:40","modified_gmt":"2024-08-07T22:14:40","slug":"engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24","status":"publish","type":"imprensa","link":"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/","title":{"rendered":"ENGIE Brasil Energia invests R$5.6 billion in renewable generation in the first half of 2Q24"},"content":{"rendered":"<!-- Start Audima Widget Injection -->\n<div id=\"audimaWidget\"><\/div>\n<script nonce=\"PQeHJp8bctdNz7Us3TSc1w==\" src=\"https:\/\/audio5.audima.co\/audima-widget.js\"><\/script>\n<!-- End Audima Widget Injection -->\n<p><strong><em>Highlights:<\/em><\/strong><\/p>\n<ul>\n<li>Net operating revenue reported an increase of 7.4% against 2Q23, reaching R$ 2.8 billion;<\/li>\n<li>In 2Q24, the Adjusted Ebitda was R$ 2.0 billion, an increase of 8.6% (R$ 154 million) compared with 2Q23. Adjusted Ebitda margin was 69.7% in 2Q24, a growth of 0.8 p.p. in relation to 2Q23;<\/li>\n<li>Adjusted net income was R$ 855 million, up 6.1% compared to the same period in 2023, an increase of R$49 million;<\/li>\n<li>The strategy for expanding assets under implementation, with:\n<ul>\n<li>the 434 MW Santo Agostinho Wind Complex reaching 98.6% of its capacity in commercial operation, totaling 69 wind turbines enabled for commercial operations, remaining only 1 in test phase;<\/li>\n<li>the first 15 generator units at the 846 MW Serra do Assuru\u00e1 Wind Complex began operating commercially, ahead of schedule, on August 6, 2024, with authorization of the Brazilian National Electric Energy Agency (Aneel);<\/li>\n<li>the Gavi\u00e3o Real Transmission System in Par\u00e1 was fully energized on July 8, 2024;<\/li>\n<\/ul>\n<\/li>\n<li>Approved, the distribution of interim dividends in the amount of R$932.8 million (R$1.1432\/share), equivalent to 55% of distributable net income (excluding gains from partial sale of a stake in TAG) for the first half of 2024.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>In line with its growth strategy, ENGIE Brasil Energia ended the first half of 2024 with a record volume of investments in renewable generation. With R$2.1 billion allocated in 2Q24, the Company has already invested R$5.6 billion in the first half of the year: R$3.1 billion for new projects, R$2.4 billion for the acquisition of operational photovoltaic complexes (totalling 547.6 MW), as well as additional amounts directed to modernization of hydropower plants and to the maintenance and revitalization of the generator park as a whole.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cENGIE Brasil Energia remains committed to investing in renewable energy, expanding its generator park and balancing the source of revenue between the regulated market and the free contracting environment. We also continue to consolidate the way ahead in the transmission segment, maintaining a diversified portfolio of operations in the electricity sector\u201d, Eduardo Sattamini, Chief Executive Officer of ENGIE Brasil Energia points out.<\/p>\n<p>&nbsp;<\/p>\n<p>In the second quarter of 2024, ENGIE Brasil Energia recorded adjusted Ebitda of R$ 2.0 billion, growth of 8.6% compared with 2Q23, and adjusted net income of R$ 855 million, an increase of 6.1% compared to the amount achieved in the same period last year. Net operating revenue of R$ 2.8 billion, an increase of 7.4% compared to the second quarter in 2023.<\/p>\n<p>&nbsp;<\/p>\n<p>The revenue obtained from an indemnity payment for the delay in the implementation of the Santo Agostinho Wind Complex of R$262 million, as well as the impact from short-term transactions in the period both contributed to the positive results of the period. The main attenuating factors were the sale of the Pampa Sul Thermoelectric Plant in 2Q23 and the reduction in equity income result due to the partial sale of the stake in TAG.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cGenerating positive results reaffirms our commitment to generate value for our shareholders and reinforces confidence in our investment strategy in Brazil\u201d, comments Eduardo Takamori Guiyotoku, Chief Financial and Investor Relations Officer at ENGIE Brasil Energia. \u201cDespite a high investment, the Company continues to honour its dividend policy, with a payout of 55% of distributable net profit, which excludes gains from the sale of the stake in TAG\u201d, highlights Takamori.<\/p>\n<p>&nbsp;<\/p>\n<p>The Board of Directors approved the distribution of R$932.8 million (R$1.14324649075\/share) in the form of interim dividends. The shares will be traded ex-dividends starting August 22 and the payment date will be defined later by the Executive Board.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Evolution in Renewable Generation and Transmission Projects<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>In the generation segment, the commissioning of 70 wind turbines in the Santo Agostinho Wind Complex, in Rio Grande do Norte, was completed, totalling 100% of the installed capacity (434 MW), of which 69 are already in commercial operation and one at a test phase. In addition, 15 generator units at the Serra do Assuru\u00e1 Wind Complex began operations commercially, ahead of planned schedule, in the state of Bahia. The project, expected to be completed by the end of 2025, will have 846 MW of installed capacity. Progress was also made in the work on the Ass\u00fa Sol Photovoltaic Complex (BA), which will total 752 MWac (895 MWp) after completion, estimated for 2025.<\/p>\n<p>&nbsp;<\/p>\n<p>As for the transmission segment, the Gavi\u00e3o Real Transmission System, and complementary to the Novo Estado transmission line in the state of Par\u00e1, was fully energized during the period, while work began on the implementation of Asa Branca, with transmission lines extending by approximately one thousand kilometers across the states of Bahia, Minas Gerais and Esp\u00edrito Santo.<\/p>\n<p>&nbsp;<\/p>\n<p>At the end of 2Q24, ENGIE Brasil Energia had a total of 9,059,0 MW of 100% renewable installed capacity, operating a generator park of 10,768.8 MW, comprising 103 plants, these being made up of 11 hydropower and 92 complementary plants \u2014 biomass-fired, SHPs, and wind and solar powered together with grants awarded for a total of 2.710 km of transmission line.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Developments in the Free Energy Market<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>The average energy sales price, net of charges on revenue and operations from trading<em>,<\/em> was R$220.57\/MWh in 2Q24, an amount 0.4% greater than 2Q23, when the price stood at R$ 219.80MWh. The increase reflects the acquisition of the Juazeiro, S\u00e3o Pedro, Sol do Futuro, Sert\u00e3o Solar and Lar do Sol photovoltaic complexes \u2013 assets with contracted energy at higher prices than the prevailing average for the remainder of the Company\u2019s portfolio \u2013 as well as monetary restatement of current long-term agreements.<\/p>\n<p>\u201cOur commercial strategy has once again proven to be adequate to market conditions. The gradual sale of future availability provides a comfortable position for contracting the portfolio, limiting exposure to short-term price volatility and eliminating the need to maintain strong sales at a time of low prices, the case during part of the 2nd quarter of this year,\u201d explains Sattamini.<\/p>\n<p>The amount of energy sold totalled 8,864 GWh (4,058 average MW), a year-on-year reduction of 4.6%, excluding trading operations. This decrease was driven by the reduction in the volume of sales to distributors, due to the sale of the subsidiary Pampa Sul in 2Q23 and the lower volume of purchases in 2Q24, and consequently, a lower volume available for sale in the free contracting environment.<\/p>\n<p>Despite this, ENGIE Brasil Energia reported a 56.3% growth in the number of customers served in the Free Energy Market compared to the same period of the previous year. This is due to the gradual opening of the Free Contracting Environment, since January 2024, for small and medium-sized consumers hooked into the high voltage network, a segment that purchases smaller volumes of energy for its operations.<\/p>\n<p>We are developing a balanced strategy for capturing these customers, expanding ENGIE\u2019s recognition in different regions of the country, educating the market regarding the benefits of migration to the Free Energy Market and supporting the simplification of this process for the entrepreneur through our expertise on the theme&#8221;, says Eduardo Sattamini.<\/p>\n<p>In total, in 2Q24, the share of free customers was 43% of total physical sales and 36% of net operating revenue in the Company&#8217;s generation segment.<\/p>\n<script>console.log('Aud01');<\/script>","protected":false},"excerpt":{"rendered":"<p>With a record volume of investments in 2024, the Company materializes its growth plan in Brazil. The estimate is for a further R$8 billion in investments by the end of 2025.<\/p>\n","protected":false},"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-115429","imprensa","type-imprensa","status-publish","format-standard","hentry","tipo-release-renewables-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ENGIE Brasil Energia invests R$5.6 billion in renewable generation in the first half of 2Q24 - ENGIE Brasil<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ENGIE Brasil Energia invests R$5.6 billion in renewable generation in the first half of 2Q24 - ENGIE Brasil\" \/>\n<meta property=\"og:description\" content=\"With a record volume of investments in 2024, the Company materializes its growth plan in Brazil. The estimate is for a further R$8 billion in investments by the end of 2025.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/\" \/>\n<meta property=\"og:site_name\" content=\"ENGIE Brasil\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-07T22:14:40+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engie.com.br\\\/en\\\/imprensa\\\/press-releases\\\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\\\/\",\"url\":\"https:\\\/\\\/www.engie.com.br\\\/en\\\/imprensa\\\/press-releases\\\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\\\/\",\"name\":\"ENGIE Brasil Energia invests R$5.6 billion in renewable generation in the first half of 2Q24 - ENGIE Brasil\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engie.com.br\\\/#website\"},\"datePublished\":\"2024-08-07T22:13:23+00:00\",\"dateModified\":\"2024-08-07T22:14:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engie.com.br\\\/en\\\/imprensa\\\/press-releases\\\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engie.com.br\\\/en\\\/imprensa\\\/press-releases\\\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engie.com.br\\\/en\\\/imprensa\\\/press-releases\\\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engie.com.br\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Press Releases\",\"item\":\"https:\\\/\\\/www.engie.com.br\\\/en\\\/imprensa\\\/press-releases\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ENGIE Brasil Energia invests R$5.6 billion in renewable generation in the first half of 2Q24\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engie.com.br\\\/#website\",\"url\":\"https:\\\/\\\/www.engie.com.br\\\/\",\"name\":\"ENGIE Brasil\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engie.com.br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ENGIE Brasil Energia invests R$5.6 billion in renewable generation in the first half of 2Q24 - ENGIE Brasil","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/","og_locale":"en_US","og_type":"article","og_title":"ENGIE Brasil Energia invests R$5.6 billion in renewable generation in the first half of 2Q24 - ENGIE Brasil","og_description":"With a record volume of investments in 2024, the Company materializes its growth plan in Brazil. The estimate is for a further R$8 billion in investments by the end of 2025.","og_url":"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/","og_site_name":"ENGIE Brasil","article_modified_time":"2024-08-07T22:14:40+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/","url":"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/","name":"ENGIE Brasil Energia invests R$5.6 billion in renewable generation in the first half of 2Q24 - ENGIE Brasil","isPartOf":{"@id":"https:\/\/www.engie.com.br\/#website"},"datePublished":"2024-08-07T22:13:23+00:00","dateModified":"2024-08-07T22:14:40+00:00","breadcrumb":{"@id":"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/engie-brasil-energia-invests-r5-6-billion-in-renewable-generation-in-the-first-half-of-2q24\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engie.com.br\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Press Releases","item":"https:\/\/www.engie.com.br\/en\/imprensa\/press-releases\/"},{"@type":"ListItem","position":3,"name":"ENGIE Brasil Energia invests R$5.6 billion in renewable generation in the first half of 2Q24"}]},{"@type":"WebSite","@id":"https:\/\/www.engie.com.br\/#website","url":"https:\/\/www.engie.com.br\/","name":"ENGIE Brasil","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engie.com.br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.engie.com.br\/en\/wp-json\/wp\/v2\/imprensa\/115429","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engie.com.br\/en\/wp-json\/wp\/v2\/imprensa"}],"about":[{"href":"https:\/\/www.engie.com.br\/en\/wp-json\/wp\/v2\/types\/imprensa"}],"version-history":[{"count":0,"href":"https:\/\/www.engie.com.br\/en\/wp-json\/wp\/v2\/imprensa\/115429\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.engie.com.br\/en\/wp-json\/wp\/v2\/media?parent=115429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}